







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with







See the difference
Before
After
Before
After
Before
AfterHow Much Does Bathroom Remodel Cost in San Jose?
A bathroom remodel in San Jose typically costs between $10,620 and $33,040, with most mid-size projects landing between $14,000 and $22,000 in 2026. The range reflects real differences in square footage, fixture choices, waterproofing requirements, and whether you’re reconfiguring plumbing or refreshing what’s already there. We’ll show you exactly where that money goes below, from demolition to the final walkthrough.
Before you read further, know this: the number we give you in writing is the number you pay. No change orders because someone “found something” behind the wall. We write the price before work starts, and we stand behind the result for a full year under our 365-Day Done Right Promise.

Key Takeaways: San Jose Bathroom Remodel Pricing
- Full bathroom remodel: $10,620 – $33,040, depending on size, scope, and material grade
- Small bathroom or powder room: $5,900 – $14,160
- Walk-in shower installation: $5,310 – $14,160 as a standalone project
- Labor typically runs 35 – 50% of the total, with the rest split between fixtures, tile, cabinetry, and plumbing
- San Jose permit fees add $500 – $1,800 to most projects, depending on whether you’re moving plumbing or changing the layout
- Most San Jose remodels take 3 – 6 weeks from demo to final cleanup
Bathroom Remodel Cost Breakdown (2026)
Here’s a real line-item breakdown for a typical 5×8 bathroom remodel in San Jose. These are the numbers we use when we build a written estimate for homeowners in Willow Glen, Almaden Valley, Japantown, and the rest of the city.
| Line Item | Low End | High End | Notes |
|---|---|---|---|
| Demolition & disposal | $800 | $2,200 | Tile removal, old tub or shower tear-out, hauling fees |
| Plumbing rough-in & fixture install | $1,800 | $5,500 | Higher if you’re moving the toilet, drain, or supply lines |
| Electrical work | $600 | $2,000 | New GFCI outlets, lighting, ventilation fan circuit |
| Waterproofing & substrate prep | $1,200 | $3,000 | Cement board substrate (the moisture-resistant layer behind your tile), membrane, pan liner |
| Tile work | $2,000 | $6,500 | Floor and shower walls; labor plus tile at $4 – $15 per square foot for material |
| Shower or tub unit | $900 | $4,500 | Walk-in shower pan, glass enclosure, or new tub |
| Vanity & countertop | $900 | $3,500 | Stock vanity to semi-custom with Cambria or Silestone quartz top |
| Toilet & fixtures | $400 | $1,800 | Kohler, Moen, Delta, or Toto |
| Paint, trim, & finishing | $400 | $1,200 | Ceiling, walls, baseboards |
| Permits | $500 | $1,800 | City of San Jose fees vary by scope |
| Typical total | $9,500 | $32,000 | Permit fees included |
So yes, there are jobs that come in under $10,620. A powder room refresh with a new vanity and toilet but no tile work can land around $6,000. And a luxury primary bathroom in a Almaden Valley home with heated floors, a freestanding tub, and custom glass can push past $33,000. The table exists to give you honest starting points, not to box you in.
Want a written price for your specific bathroom? Call (669) 274-2362 and we’ll set up a free estimate. The number we hand you covers the full scope. No surprises.

What Affects Bathroom Remodel Pricing in San Jose
- Plumbing relocation. Moving a toilet or shower drain across the room means opening the subfloor, rerouting waste lines, and sometimes dealing with San Jose’s older cast iron-pipe inventory. Homes built before 1970 in neighborhoods like Rose Garden and Willow Glen regularly require pipe replacement once we open walls. Add $1,500 – $4,000 if you’re shifting fixtures.
- Waterproofing method. We install cement board substrate, not drywall, behind every shower and tub surround. It costs more than drywall and takes longer, but it’s what keeps your remodel from failing in year two. A full Schluter membrane system for a walk-in shower adds $800 – $1,600 over a basic cement board installation.
- Tile selection and layout. Standard 12×24 porcelain runs $4 – $7 per square foot. Handmade or textured tile runs $12 – $30 per square foot. Complex layouts like herringbone or hexagonal mosaic add 20 – 30% to tiling labor because every cut takes longer.
- Vanity and countertop choices. A stock 30-inch vanity with a cultured marble top might run $400 – $700. A semi-custom KraftMaid or Wellborn vanity with a Cambria quartz countertop starts around $1,800 and can reach $3,500 for 60-inch double-sink setups.
- Age of the house. San Jose’s housing stock spans 1920s bungalows in Naglee Park to 1990s tract homes in Evergreen. Older homes bring surprises: outdated wiring that no longer meets code, galvanized plumbing that needs replacement, and subfloors with water damage from decades of minor leaks. Budget 10 – 15% above your base number for a house built before 1980.
- Permit scope. The City of San Jose requires permits for any work that moves plumbing, modifies electrical, or changes wall structure. A basic fixture swap without layout changes might not require one, but if you’re reconfiguring a shower or moving a wall, expect city permit fees and inspections. We handle the paperwork; the cost is in our written estimate.
What Does a Small Bathroom Remodel Cost in San Jose?
A small bathroom remodel in San Jose runs $5,900 – $14,160, and plenty fall right around $8,000 to $10,000. Think powder rooms, guest baths, and compact 5×7 spaces where you’re replacing the vanity, toilet, flooring, and maybe the shower surround without moving plumbing. In neighborhoods like Cambrian Park and Berryessa where original 1960s and 1970s tile still covers bathroom walls, typical jobs involve gutting old pink or avocado tile, updating the electrical to current GFCI standards, and installing a new tub surround.
If the small bathroom includes a tub-to-shower conversion, see our tub-to-shower conversion cost guide, which runs $4,130 – $11,800 as a standalone project.
Walk-In Shower Installation Costs in San Jose
As a standalone project, a walk-in shower installation in San Jose runs $5,310 – $14,160. The biggest cost driver is glass: a frameless glass panel from a local fabricator runs $1,200 – $3,500 depending on thickness and hardware finish. The second-biggest is waterproofing, which we mentioned above. A curbless walk-in shower, popular with San Jose homeowners planning to age in place, costs more because the subfloor must be recessed or the surrounding floor raised to create proper drainage slope. We’re happy to walk you through the tradeoffs. Our full breakdown is on the walk-in shower installation page.
Full Bathroom Remodel vs. Refresh: Real Numbers
We field a lot of calls from San Jose homeowners asking whether they should do a full gut renovation or a lighter refresh. Here are honest numbers for both approaches in 2026:
- Cosmetic refresh (no plumbing changes): $5,900 – $9,000. New vanity, toilet, faucet, light fixture, mirror, paint, and possibly a reglazed tub. Done in a week.
- Mid-size remodel (replace everything, keep layout): $10,620 – $18,000. New tile floor and shower surround, new tub or shower pan, new vanity, countertop, fixtures, lighting, and vent fan. Done in 2 – 3 weeks.
- Full gut remodel with layout changes: $18,000 – $33,040. Moving plumbing, new electrical, expanded shower, custom cabinetry, premium tile, and better lighting. Done in 4 – 6 weeks.
When a customer in Almaden Valley asks whether it’s cheaper to repair or replace a failing shower, the answer depends on the substrate. If water has reached the cement board or studs, you’re replacing, not repairing. If the issue is cosmetic, a shower replacement runs $3,540 – $10,030.
Materials That Hold Up in San Jose’s Climate
San Jose’s dry summers and mild, occasionally damp winters don’t create the same moisture battles as coastal communities, but a few local factors matter. Hard water is common in many San Jose neighborhoods, which shortens the life of cheap fixtures and leaves mineral buildup on glass. We install Kohler, Moen, Delta, and Toto fixtures specifically because their internal cartridges hold up to hard water better than bargain brands, and they’re easy to service if a cartridge ever needs replacement.
We also see older San Jose homes with insufficient bathroom ventilation. A quality exhaust fan ducted to the exterior, not just into the attic, matters. We spec Panasonic fans as our standard because they run quiet and move enough air to keep moisture from settling into painted surfaces and grout. It’s a $150 – $400 upgrade during the remodel that prevents staining and mold headaches later. And we install Cambria quartz or Silestone countertops on vanities, both of which carry manufacturer warranties that run alongside our own 365-day promise.
How to Pay Less Without Cutting the Wrong Corners
- Keep the toilet and vanity in place. Moving plumbing is one of the largest cost drivers. If your current layout works, leave it.
- Choose ceramic over porcelain for shower walls when budget matters. Ceramic tile is easier to cut, which reduces labor, and quality ceramic from Dal-Tile or Marazzi will last decades in a well-waterproofed shower.
- Use large-format tile. 12×24 tile covers more square feet per piece, which means fewer cuts, less thinset, and faster installation. We sometimes see $300 – $600 in labor savings on a shower surround.
- Reglaze a cast-iron tub instead of replacing it. If the tub is in good structural shape, a professional reglaze costs $500 – $900 versus $1,500 – $4,000 for a new tub and installation.
- Pull a permit. It sounds like an extra cost, but unpermitted work can cost you at resale. In San Jose, buyers and their inspectors look for bathroom remodels done without permit. Doing it right protects the value of the work.
The one thing we’d never tell you to skip is waterproofing. The cement board substrate (that moisture-resistant layer behind your tile) is the difference between a shower that lasts 30 years and one that starts crumbling in five. We’ve torn out showers in San Jose that looked great on the surface and revealed black rot underneath because someone tiled directly over drywall. The $1,200 – $3,000 waterproofing line item is the cheapest insurance in the whole project.
How Penhallow Remodeling Prices a Bathroom Remodel
Led by Trevor Nash, Penhallow Remodeling San Jose operates under the Kingswell Way standard, established in 2004. The Kingswell Way means three things: say the price before the work, show up in the window we gave, and leave the place cleaner than we found it.
When we visit your home for a free estimate, we measure, inspect the existing plumbing and electrical, discuss your material preferences, and then go back and build a written estimate line by line. You get a written price before any work starts. Not a range. Not a verbal ballpark. A number.
Every project also includes our 365-Day Done Right Promise in writing: if the work fails inside the guarantee period, we come back and fix it at no charge. No service call fee, no re-inspection fee. That’s the Penhallow standard, and it’s not dependent on a corporate office in another state. Each location is independently owned and operated as part of the Kingswell family of companies.
Our technicians are background-checked and arrive in uniform. You’ll know exactly who is walking into your home, and a live person answers our phone 24/7. Not an answering service. A person.
How Long Does a Bathroom Remodel Take in San Jose?
Most mid-size bathrooms take 3 – 4 weeks from demo to final walkthrough. Full gut remodels with layout changes run 4 – 6 weeks. The variables are material lead times (custom vanities from Wellborn or KraftMaid can take 3 – 5 weeks to arrive after ordering), city inspection scheduling, and the condition of what we find behind the walls. We build material order timing into our project schedule so we’re not tearing out your only bathroom and then waiting three weeks on a vanity.
For a detailed schedule breakdown, including what happens each week, see our Bathroom Remodel in San Jose page.
FAQs – Bathroom Remodel Cost
Is it cheaper to remodel a bathroom or replace individual fixtures?
Replacing individual fixtures is cheaper in the short term. A toilet swap runs $400 – $800 installed. A vanity installation runs $945 – $3,540. But if your shower surround is failing, your subfloor is soft, or your plumbing is leaking, piecemeal fixes end up costing more than a full remodel within a few years. Call (669) 274-2362 and we’ll assess whether you need a full remodel or targeted repairs. Estimates are free.
How much does a tub-to-shower conversion cost in San Jose?
A tub-to-shower conversion in San Jose runs $4,130 – $11,800. The spread depends on whether you want a prefabricated shower base or a custom-tiled pan, and whether you’re adding a glass enclosure or leaving it open. Our tub-to-shower conversion cost guide breaks down the full range.
Can you remodel a bathroom for under $10,000 in San Jose?
Yes, if it’s a small bathroom and you keep the layout intact. A 5×7 guest bath with a standard tub surround, stock vanity, and mid-range tile can come in between $8,000 and $10,000. Smaller powder rooms can run $5,900 – $7,500. Call us at (669) 274-2362 with your square footage and we’ll tell you honestly what’s realistic.
How much does a bathroom vanity installation cost in San Jose?
Bathroom vanity installation runs $945 – $3,540 in San Jose, depending on whether you’re swapping an existing vanity in the same footprint or running new water lines for a different cabinet size. That range includes basic plumbing hookup but not countertop fabrication on the high end. More details on our bathroom vanity installation page.
Can you start a bathroom remodel right away?
Our schedule depends on current project volume, but we give you a defined arrival window before signing, not a “sometime next month” promise. The Kingswell Way standard means we put a start date on the written agreement. Call (669) 274-2362 and we’ll tell you our current availability over the phone.
Do you handle the San Jose permits for a bathroom remodel?
Yes. We manage the permit application and inspections through the City of San Jose for any project that requires them. Permit fees are included as a line item in your written estimate, and the final inspection is scheduled as part of the project timeline. We don’t ask you to visit City Hall. We handle it.
Home · Bathroom Remodel in San Jose
Written by Trevor Nash, Owner at Penhallow Remodeling San Jose, serving San Jose homeowners with written pricing and guaranteed workmanship since the Kingswell Way began in 2004.
Pricing reflects the San Jose market as of 2026. Penhallow Remodeling San Jose offers free estimates – call (669) 274-2362.
What Our Customers Say
"We'd been burned by a contractor before who disappeared halfway. Penhallow finished on time and stood behind everything. The written price gave me peace of mind the whole way."
- Simone Clarke"Full home refresh before we sold. They were straight about what was worth doing and what wasn't to get our money back. On time, on budget, and it sold in a week."
- Monica Vaughn"Did our whole kitchen. The written estimate held, which after reading remodel nightmares online I did not take for granted. Showed up every morning on time and the crew was clean and polite."
- Warren Updike












